All achivements
Turbine shaft modification impact assessment
Assessment in order to simulate the machining impact on the turbine shaft behaviour
Tool for fitting a coded ring on a rim
Design of a tool for fitting coded wheel on a scooter rim.
Tool for fixing screws
Design of a screw fixing tools
Design and supply of a securing & handling gantry
Design of a railing with an automatic closure gate and a gantry equipped with a bracket allowing a fall protection system and a hoist fixation, in order to secure maintenance technicians descent in thehydroelectric power plants turbines.
3D and 2D drawings realization from originals paper ones
3D and 2D plans realization based on the originals concerning the flood evacuation of the Vogelgrun hydroelectric power plant in order to include changes due to maintenance.
Hydraulic cylinder storage rack
Design, sizing, supply and installation on site of a storage rack for hydraulic cylinders up to 6 meters high and 3 tons weight.
Turbine floor – Access to piston kaplan
Design, sizing and supply of a turbine floor in order to make some refurbishment work on a turbine safely.
Turbine floor – Access to piston pivot
Design, sizing and supply of a turbine floor in order to make some refurbishment work on a turbine safely.